A water savings program engaged to achieve savings in a 68-unit building.

  • Installation of proprietary toilet valves
  • In-suite efficiency upgrades for shower heads and kitchen and bath aerators to reach EPA standard flow rate.

In 2022, this building had annual sewer and water costs of $135,061. Savings installations took place in August 2023.

Before installations (Sep–Nov 2022) After installations (Sep–Nov 2023) Savings
Usage in gallons 2,731,885 949,277 1,782,608
Water Cost $40,978 $14,239 $26,739

Savings / Payback / ROI

The net benefit of our water savings Vendor conservation program is annual savings of approximately $107,101.

  • The initial average usage of 365 Gallons / Unit/ Day (2022 Consumption)
  • Revised average usage of 155 Gallons / Day (Aug-Nov 2023)
  • Water and Sewer Cost of $11.63 / 748 Gallons
  • Annual Hot water savings of $26,601